|
2019, Vol. 56(6): 1-10 DOI: | ||
Study on the Key Techniques for Comprehensive Control of Heat Harm of the Deep-buried and Super-long Tunnel with High Ground Temperature | ||
(China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031) | ||
Received null Revised null | ||
Supporting info | ||
|