|
2019, Vol. 56(6): 27-35 DOI: | ||
Study on Effect of Backfilling Grouting Thickness on Anti-floating of the Shield Tunnel | ||
(1 Hangzhou Metro Group Co., Ltd., Hangzhou 310017; 2 PowerChina Huadong Engineering Corporation Limited, Hangzhou 311122;3 Zhejiang Engineering Research Center of Smart Rail Transportation, Hangzhou 311225; 4 College of Civil and Transportation Engineering, Hohai Unversity, Nanjing 210098) | ||
Received null Revised null | ||
Supporting info | ||
|