|
2019, Vol. 56(6): 196-202 DOI: | ||
Countermeasures for the Shield Tunnel Passing through the Karst Area Overlying Soft Plastic Red Clays | ||
(China Railway Major Bridge Reconnaissance & Design Institute Co., Ltd.,Wuhan 430050) | ||
Received null Revised null | ||
Supporting info | ||
|