|
2020, Vol. 57(1): 76-82 DOI: | ||
Calculation Method for the Surrounding Rock Pressure of Mined Lower Tunnel Structure of a Metro Station Built by Combination of Open Cut and Mined Method | ||
(1 School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 2 Tangshan Graduate School, Southwest Jiaotong University, Tangshan 063000; 3 China Railway Tunnel Group Co., Ltd, Nanning 530000) | ||
Received null Revised null | ||
Supporting info | ||
|