现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2020, Vol. 57(1): 175-179    DOI:
Discussion on the Construction Method for the Extra-long Shengli Road Tunnel in Tianshan
(CCCC-SHEC Meng Xing Engineering Co., Ltd., Xi′an 710119)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn