现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2020, Vol. 57(2): 61-67    DOI:
Structure Design and Parameter Analysis of a Large-section Sea-crossing Shield Tunnel
(1 Guangdong Communication Planning & Design Institute Co.,Ltd., Guangzhou 510507;2 Wenzhou Mass Transit Railway Investment Group Co., Ltd., Wenzhou 325000;3 School of Highway, Chang′an University, Xi′an 710064)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn