现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2020, Vol. 57(2): 80-85    DOI:
Six-stage Ventilation Techniques for the Large and Long Gas Tunnel with Trackless Transportation and Advance Construction of Parallel Adit
(1 China Railway 16th Bureau Group Co., Ltd, Beijing 100018; 2 College of Pipeline and Civil Engineering, China University of Petroleum, Qingdao 266580)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn