|
2020, Vol. 57(3): 43-48 DOI: | ||
Application Research of BIM Technology in Engineering Design of the Immersed Tube Tunnel | ||
(Guangzhou Municipal Engineering Design & Research Institute Co.,Ltd,Guangzhou 510060) | ||
Received null Revised null | ||
Supporting info | ||
|