现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2020, Vol. 57(3): 91-98    DOI:
Numerical Simulation Analysis of SF6 Gas Leakage in Extra-Long GIL Utility Tunnel
(1 Arup International Consultants (Shanghai) Co., Ltd., Shanghai 200031; 2 China Electric Power Research Institute Co., Ltd., Wuhan430074; 3 Ove Arup & Partners International Limited,London B908AE, UK; 4 Central Southern China Electric Power Design Institute Co., Ltd., Wuhan 430000)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn