|
2020, Vol. 57(5): 104-109 DOI: | ||
Numerical Simulation of Ground Subsidence Induced by Shield Tunnel Construction Disturbance in Water-rich Sandy Stratum | ||
(1 Key Laboratory of Geotechnical and Underground Engineering(Tongji University), Ministry of Education, Shanghai 200092;2 Department of Geotechnical Engineering, College of Civil Engineering, Tongji University, Shanghai 200092; 3 Shanghai Geological& Mineral Engineering Investigation Co.,Ltd., Shanghai 200072) | ||
Received null Revised null | ||
Supporting info | ||
|