|
2020, Vol. 57(5): 184-192 DOI: | ||
Analysis on Mechanism of Longitudinal Grouting Uplift of Existing Metro Tunnel | ||
(1 College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060;2 Key Laboratory of Coastal Urban Resilient Infrastructures (Shenzhen University), Ministry of Education, Shenzhen 518060) | ||
Received null Revised null | ||
Supporting info | ||
|