|
2020, Vol. 57(6): 46-54 DOI: | ||
Numerical Simulation Analysis of the Rockburst Mechanism in the Tunnel with High Geostress | ||
(Beijing Third Construction Engineering Quality Test Institute Co.,Ltd,Beijing 100037) | ||
Received null Revised null | ||
Supporting info | ||
|