现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2020, Vol. 57(6): 63-69    DOI:
3D Numerical Simulation of the Interaction between Rock Mass and Shield TBM Passing through the Fault Fracture Zone
(1 China Construction Third Bureau Engineering Design, Co., Ltd, Wuhan 430074; 2 State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology, Xuzhou 221116)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn