|
2020, Vol. 57(6): 133-141 DOI: | ||
Analysis of Mechanical Properties and Influencing Factors of High-filled Cut-and-Cover Tunnel in Trench | ||
(1 College of Civil Engineering, Lanzhou Jiaotong University, Lanzhou Gansu 730070; 2 Beijing High-speed Railway Works Maintenance Division of China Railway Beijing Group Co., Ltd., Beijing 100071) | ||
Received null Revised null | ||
Supporting info | ||
|