|
2020, Vol. 57(6): 171-176 DOI: | ||
Comprehensive Geological Prediction of Dongtianshan Tunnel Entrance Passing through the Fault and Intensely Weathered Water-rich Zone | ||
(1 CCCC First Highway Engineering Group Co. Ltd.,Beijing 100024;2 Beijing Jiaotong University, Beijing 100044;3 Beijing Key Laboratory of Underground Engineering Construction Prediction and Pre-warning,Beijing 100037) | ||
Received null Revised null | ||
Supporting info | ||
|