|
2021, Vol. 58(1): 217-222 DOI: | ||
Study on Causes to and Treatment of Concrete Cracking of the Secondary Lining of Qilianshan Tunnel | ||
1 Wuwei Track Maintenance Division, China Railway Lanzhou Group Co., Ltd., Wuwei 733000; 2 School of Civil Engineering,Lanzhou Jiaotong University, Lanzhou 730070) | ||
Received null Revised null | ||
Supporting info | ||
|