|
2021, Vol. 58(2): 41-50 DOI: | ||
Development of a Real-time Monitoring System of Cutterhead Conditions in Shield Tunnelling | ||
(1 Key Laboratory of Urban Security and Disaster Engineering of Ministry of Education, Beijing University of Technology, Beijing 100124; 2 China Railway Engineering Equipment Group Co., Ltd., Zhengzhou, 450016; 3 Beijing JiuRui Technologies Co., Ltd.,Beijing 100107) | ||
Received null Revised null | ||
Supporting info | ||
|