现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2021, Vol. 58(2): 220-227    DOI:
Comparison of Construction Schemes and Layout of Temporary Facilities for the Entrance/Exit Section of a Large-section Loess Tunnel on High and Steep Slope
(Erchu Co.,Ltd. of China Railway Tunnel Group, Langfang 065201)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn