现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2021, Vol. 58(3): 115-122    DOI:
Theoretical Analysis of the Stability of Tunnel Face under Pipe Roof Presupport
(1 Hunan University of Science and Technology, Xiangtan 411201; 2 China Construction Tunnel Corp., Ltd., Chongqing 401320;3 China Railway 16th Bureau Group Road and Bridge Engineering Co., Ltd., Beijing 101500)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn