现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2021, Vol. 58(3): 139-146    DOI:
Analysis of the Mechanical Response in the Construction of Large-Span Mined Metro Stations by the Arch-Cover Method
(1 College of Transportation Engineering, Dalian Maritime University, Dalian 116026; 2 Construction Branch of Shanghai Civil Engineering Group Co., Ltd. of CREC, Shenyang 110000)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn