|
2021, Vol. 58(4): 104-108 DOI: | ||
3D Large-scale Seismic Response Analysis of Bored Section of an Immersed Tunnel Project | ||
(1 Department of Geotechnical Engineering College of Civil Engineering, Tongji University, Shanghai 200092; 2 Key Laboratory of Geotechnical and Subsurface Engineering of the Ministry of Education, Tongji University, Shanghai 200092; 3 Dalian Bay Undersea Tunnel Co., Ltd., Dalian 116024; 4 Dalian Municipal Design & Research Institute Co., Ltd., Dalian 116021; 5 Shanghai Construction No.1 (Group) Co., Ltd., Shanghai 200120) | ||
Received null Revised null | ||
Supporting info | ||
|