|
2021, Vol. 58(4): 170-177 DOI: | ||
Centrifugal Model Test on Construction Process of a Super Large Diameter Shield Tunnel Passing under Existing Railway | ||
(1 CCCC Second Highway Survey and Design Institute Co., Ltd., Wuhan 430056;2 College of Civil and Transportation Engineering,Shenzhen University, Shenzhen 518061;3 Key Laboratory of Coastal Urban Resilient Infrastructures (MOE), Shenzhen University,Shenzhen 518061) | ||
Received null Revised null | ||
Supporting info | ||
|