|
2021, Vol. 58(4): 194-202 DOI: | ||
Analysis of Settlement Deformation and Construction Node Control of a Double-Line Shield Tunnelling Passing under Existing Tunnel in Close Distance | ||
(Beijing Mass Transit Railway Operation Corporation Limited, Beijing 100044) | ||
Received null Revised null | ||
Supporting info | ||
|