|
2021, Vol. 58(5): 85-95 DOI: | ||
On Parameter Optimization for a Slurry Shield Approaching Construction under Existing Subway Tunnels in Water-Rich Pebble and Mudstone Composite Stratum | ||
(1 College of Architecture and Communications, Liaoning Technical University, Fuxin 123009; 2 School of Civil Engineering, Liaoning Technical University, Fuxin 123009;3 The Fifth Construction Ltd. of China Tiesiju Civil Engineering Group, Jiujiang 332000) | ||
Received null Revised null | ||
Supporting info | ||
|