|
2021, Vol. 58(5): 179-186 DOI: | ||
Analysis of and Prevention Countermeasures for Underground Engineering Risks in Red Bed Areas with Developed Karst | ||
(1 Chinese Society for Rock Mechanics & Engineering, Beijing 100029; 2 State-owned Assets Supervision and Administration Commission of Guangzhou Municipal Government, Guangzhou 510230; 3 Guangzhou Metro Design Institute Co., Ltd., Guangzhou 510010; 4 Guangzhou Metro Group., Ltd., Guangzhou 510030) | ||
Received null Revised null | ||
Supporting info | ||
|