|
2021, Vol. 58(5): 196-203 DOI: | ||
Experimental Study on Dust Reduction Technology for D&B Tunnelling | ||
(1 Xi′an Highway Research Institute Co., Ltd., Xi′an 710065; 2 CCCC Second Highway Engineering Co., Ltd., Xi′an 710065;3 Central South Survey Design Institute Group Co., Ltd., Wuhan 430071) | ||
Received null Revised null | ||
Supporting info | ||
|