现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2021, Vol. 58(6): 59-67    DOI:
Numerical Simulation Study on Whole Construction Process of Vertical Pipe Jacking
(1 Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015; 2 College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn