|
2021, Vol. 58(6): 129-136 DOI: | ||
Study on Influence of New Transfer Channel Construction on Deformation of Overlying Existing Metro Station in Sandy Pebble Stratum | ||
(1 Guangzhou Metro Design Institute Co., Ltd., Guangzhou 510010; 2 Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 3 School of Civil Engineering, Southwest Jiaotong University,Chengdu 610031) | ||
Received null Revised null | ||
Supporting info | ||
|