|
2021, Vol. 58(6): 155-162 DOI: | ||
Analysis of Influence of Arc Cutterhead on Ground Settlement during EPB Shield Construction | ||
(1 Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031;2 Chengdu Construction Investment Co., Ltd., China Power Construction Corporation, Chengdu 610212) | ||
Received null Revised null | ||
Supporting info | ||
|