|
2021, Vol. 58(6): 188-196 DOI: | ||
Study on Key Intelligent Construction Technologies of Super-long and Deepburied Hydraulic Tunnels under Complex Geological Conditions | ||
(China Railway 18 Bureau Group Second Engineering Co., Ltd., Tangshan 064000) | ||
Received null Revised null | ||
Supporting info | ||
|