现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2021, Vol. 58(6): 218-224    DOI:
Study on Pre-reinforcement Schemes for a Shield Tunnel Passing under the Pile Foundation of an Urban Viaduct
(CCCC Second Highway Consultants Co., Ltd., Wuhan 430056)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn