|
2022, Vol. 59(1): 149-155 DOI: | ||
Study on the Water Inrush Mechanism in Tunnelling with Karst Conduits Based on Nonlinear Seepage Model | ||
(1. CCCC Third Navigation Engineering Bureau Co., Ltd., Shanghai 200032; 2. State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074; 3. Guangxi Xinfazhan Communication Group Co., Ltd., Nanning 530029) | ||
Received 2021-09-30 Revised 2021-11-03 | ||
Supporting info | ||
|