|
2022, Vol. 59(1): 225-231 DOI: | ||
Causes and Treatment Measures of Sudden Segment Damage Failures in a Shield Tunnel under Construction | ||
(1.PowerChina Railway Construction Investment Group Co., Ltd, Beijing 100160;2.China Railway Southwest Research Institute Co.,Ltd., Chengdu 611731;3.China Railway Chengdu Rail Transit Health Management Technology Co. Ltd, Chengdu 611731) | ||
Received 2021-04-22 Revised 2021-07-13 | ||
Supporting info | ||
|