|
2022, Vol. 59(1): 232-240 DOI: | ||
Study on the Law of Separation Defects of Monolithic Track Bed in Shield Tunnels | ||
(1. China Railway City Development and Investment Group Co., Ltd., Chengdu 610218; 2. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 3. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031) | ||
Received 2021-03-29 Revised 2021-05-10 | ||
Supporting info | ||
|