|
2022, Vol. 59(2): 53-61 DOI: | ||
Study on Modes and Calculation Method of Stress and Deformation of TunnelPortal Landslide Parallel System | ||
(1. Sichuan Highway Planning, Survey, Design and Research Institute Ltd., Chengdu 610041; 2. China Railway Northwest Research Institute Co., Ltd., Lanzhou 730070; 3. China Railway Landslide Engineering Laboratory, Lanzhou 730070; 4. Provincial Laboratory of Western Environmental Geotechnical Soil and Site Remediation Technology, Lanzhou 730070) | ||
Received null Revised null | ||
Supporting info | ||
|