|
2022, Vol. 59(2): 111-121 DOI: | ||
Spatial Effect of Support Dismantling through Alternate Bay Construction Method in Shallow-buried Large-span Tunnels in Soft and Weak Strata | ||
(China Railway Liuyuan Group Co., Ltd., Tianjin 300308) | ||
Received null Revised null | ||
Supporting info | ||
|