|
2022, Vol. 59(2): 200-209 DOI: | ||
Key Design Technologies for Mechanized Construction of Railway Tunnels by Drilling and Blasting Method | ||
(1. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031; 2. CREEC (Chengdu) Survey, Design and Research Co. Ltd., Chengdu 610031) | ||
Received null Revised null | ||
Supporting info | ||
|