|
2022, Vol. 59(2): 210-219 DOI: | ||
Optimization and Application of the Construction Scheme for Large-section Tunnels in Water-rich and Weakly Cemented Strata | ||
(1. School of Civil Engineering of Xi'an University of Architecture and Technology, Xi′an 710055; 2. Shaanxi Key Laboratory of Geotechnical and Underground Space Engineering, Xi′an 710055; 3. China Railway Construction Bridge Engineering Bureau Group Co., Ltd., Tianjing 300300; 4. The No.1 Engineering Co., Ltd. of China Railway Beijing Engineering Group, Xi′an 710100) | ||
Received null Revised null | ||
Supporting info | ||
|