|
2022, Vol. 59(2): 227-241 DOI: | ||
The Concept and Practice of Treatment for Damage in Railway Tunnel Linings Caused by High-pressure Karst Water | ||
(1. China Railway Chengdu Group Co., Ltd., Chengdu 610082; 2. China Railway 18th Bureau Group Co., Ltd., Tianjin 300222;3. School of Civil Engineering, Central South University, Changsha 410075; 4. China Railway Southwest Research Institute Co., LTD.,Chengdu 611731; 5. China Tiesiju Clvil Engineering Group Co., Ltd., 4, Hefei 230000) | ||
Received null Revised null | ||
Supporting info | ||
|