|
| 2022, Vol. 59(2): 242-250 DOI: | ||
| Cause Analysis of Persistent Heaving of Tunnel Floors in Red-bed Mudstone with Complex Geo-stress | ||
| (1. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031; 2. State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology, Chengdu 610059) | ||
| Received null Revised null | ||
| Supporting info | ||
|