|
2022, Vol. 59(3): 118-127 DOI: | ||
Analysis of Deformation Impact of the Adjacent Over-crossing Parallel Tunnel Excavated by the Shallow Mining Method on the Existing Shield Tunnels | ||
(1. School of Civil Engineering, Inner Mongolia University of Science and Technology, Baotou 014010; 2. Academicians Workstation of Mine Safety and Underground Engineering, Inner Mongolia University of Science and Technology, Baotou 014010; 3. Technical Research Center for Urban Underground Engineering of Colleges and Universities in the Inner Mongolia Autonomous Region,Baotou 014010; 4. Beijing Urban Construction Design & Development Group Co., Limited, Beijing 100371) | ||
Received null Revised null | ||
Supporting info | ||
|