|
2022, Vol. 59(3): 166-171 DOI: | ||
Analysis on Factors Influencing the Pneumatic Load during Train Operation in High-speed Railway Tunnels | ||
(1. China Railway Siyuan Survey and Design Institute Group Co., Ltd., Wuhan 430063; 2. National-Local Joint Engineering Research Center of Underwater Tunnelling Technology, Wuhan 430063) | ||
Received null Revised null | ||
Supporting info | ||
|