|
2022, Vol. 59(3): 211-219 DOI: | ||
Analysis and Control of the Settlement of Super-large Diameter Shield Tunnel Passing under the Yellow River Embankment | ||
(1. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031;2. China Railway 14th Bureau Group Mega Shield Construction Engineering Co., Ltd., Nanjing 250032) | ||
Received null Revised null | ||
Supporting info | ||
|