|
2022, Vol. 59(3): 236-245 DOI: | ||
Application of Digital Detonator Staggered-phase Vibration Abatement Technology in Railway Tunnels with Ultra-close Spacing | ||
(1. China Railway 18th Bureau Group Co., Ltd., Tianjin 300222; 2. School of Civil Engineering, Central South University, Changsha 410075; 3. Guiyang Public Transportation Investment and Operation Group Co., Ltd., Guiyang 550081; 4. China Railway Chengdu Group Co., Ltd., Chengdu 610082) | ||
Received null Revised null | ||
Supporting info | ||
|