|
2022, Vol. 59(4): 226-233 DOI: | ||
Research on the Technology for the Shield Tunnel Crossing the Railway Marshalling Station in the Pebble-boulder Stratum | ||
(China Railway Electrification Engineering Group Co., Ltd., Beijing 100036) | ||
Received null Revised null | ||
Supporting info | ||
|