|
2022, Vol. 59(5): 34-40 DOI: | ||
Numerical Reconstruction of TBM Muck with Real Shape and Numerical Simulation of Muck Transfer Process | ||
(1. China Railway No.5 Engineering Group Co., Ltd., Changsha 410000 ; 2. Key Laboratory for Resilient Infrastructures of Coastal Cities, Shenzhen University, Shenzhen 518060 ; 3. College of Civil and Transportation Engineering, Shenzhen University,Shenzhen 518060 ; 4. Guangdong Hualu Transport Technology Co., Ltd.,Guangzhou 510420) | ||
Received null Revised null | ||
Supporting info | ||
|