|
2022, Vol. 59(5): 80-90 DOI: | ||
Analysis of Construction Mechanical Behavior and Parameter Optimization for Subsequent Tunnel Tube of Double-arch Tunnel without Middle Drift | ||
(1. Sichuan Communications Construction Group Co., Ltd., Chengdu 610000; 2. Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 3. School of Civil Engineering, Southwest Jiaotong University ,Chengdu 610031 ) | ||
Received null Revised null | ||
Supporting info | ||
|