现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2022, Vol. 59(5): 170-178    DOI:
Closed-loop Control Technology of Shield Thrust Hydro-cylinder Pressure Based on Target Total Thrust Vector
(1. Shanghai Tunnel Engineering Co. Ltd., Shanghai 200232; 2. Shanghai Urban Construction Tunnel Equipment Co. Ltd.,Shanghai 200137)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn