|
2022, Vol. 59(5): 195-201 DOI: | ||
Research on the Waterproof Performance of Segment Rubber Gasket Considering the Groove Boundary and Paste Quality | ||
(1. CCCC Second Harbour Engineering Company Ltd., Wuhan 430040; 2. Research and Development Center of Transport Industry of Intelligent Manufacturing Technologies of Transport Infrastructure, Wuhan 430040; 3. Key Laboratory of Large-Span Bridge Construction Technology, Wuhan 430040;4. China Road and Bridge Engineering Co., Ltd., Beijing 100011) | ||
Received null Revised null | ||
Supporting info | ||
|