|
2022, Vol. 59(6): 42-50 DOI: | ||
Study on the Upper Limit of Stability of the Slope Excavation Face of a Shield Tunnel | ||
(1. School of Soil and Water Conservation, Beijing Forestry University, Beijing 100083; 2. Beijing Municipal Construction Co., Ltd.,Beijing 100045) | ||
Received null Revised null | ||
Supporting info | ||
|